Dempsey Wood

  • Home
  • About Us
    • Contact Details
    • General
    • Directors
    • Senior Management
    • Accreditations/Affiliations
      • ISO9001/Enviromental
      • ACC
      • Site Safe
      • New Zealand Contractors Federation
    • Awards
    • Sponsorship
  • Services/Capabilities
    • Civil Construction & Infrastructure
      • Bulk Earthworks
      • Shear-Key Construction
      • Residential Land Developments
      • Streetscapes/Urban Renewals
      • Drainage (Water, Stormwater & Wastewater)
      • Concrete Construction
      • Roading/Civil
      • Commercial/Industrial Development
      • Education
      • Comprehensive Developments
    • Build/Foundations
      • Conventional Slabs
      • Ribrafts
      • Cupolex
      • Midfloors
      • Comprehensive Development
    • Resources
      • Our Resources
      • Accreditations / Affiliations
  • Project Management
  • Projects
    • F&P Healthcare
    • Auckland International Airport
    • Tiverton Road Widening
    • Browns Bay Beachfront Lane
    • Gulf Shear-Key
    • Braeburn Subdivision
  • Careers
    • Why Work For D&W?
    • List of Vacancies
    • Applications Page
  • What's New
  • Projects

    • F&P Healthcare
    • Auckland International Airport
    • Tiverton Road Widening
    • Browns Bay Beachfront Lane
    • Gulf Harbour Shear-Key
    • Braeburn Subdivision

Braeburn Subdivision.

Dempsey Wood became the preferred contractor for the final five stages of this seven-stage subdivision development. It was made up of approximately 200 lots of medium density development (600m2 sites) in Sturges Road, Henderson, Auckland.

This subdivision was the first in Auckland to individually platform house sites as the subdivision is constructed, saving crucial time and costs for our end user client

In addition to the standard land development civil works package (earthworks, drainage, roading and services), Dempsey Wood constructed:

  • Tennis courts
  • Recreational reserve
  • Playing fields
  • Concrete paved roads
  • Exposed concrete works (roundabouts and footpaths)
  • Stormwater outlet structures, including Reno mattresses

This project presented a significant challenge because the ground had a thin surface of clay underlaid with peat, and therefore high shrinkage levels. Because of this, Dempsey Wood used specific earthwork equipment to minimise vibration levels transmitting through to adjacent houses.

Dempsey Wood was later contracted to complete the siteworks and concrete floor slabs for the buildings, carparks and footpaths at the school next to the Braeburn Subdivision.

‘With a depth of internal technical experience and knowledge, Dempsey Wood is able to provide a comprehensive service that adheres to strict standards of quality and workmanship always within agreed costs and budget.’
David Halsey, General Manager, Fletcher Residential Ltd.

  • Home
  • About Us
  • Services/Capabilities
  • Project Management
  • Projects
  • Careers
  • What's New
  • Sitemap
  • Contact Us

Copyright © 2008 - 2010 Dempsey Wood. All Rights Reserved | Website Designed & Developed By Pitch.